Industrial Power: 6.2 MW Boiler
The 6.2 MW hot air boiler, the final equipment of the project, once again demonstrates ENEVA’s engineering strength in heat process technologies.
The integrated economizer package waste heat steam boiler we produced for a 2 MWe capacity cogeneration plant has been successfully delivered to our customer for shipment to Uzbekistan.
The system developed within the scope of the project aims to increase energy efficiency by recovering waste heat generated in cogeneration plants and using it for steam production.